Enviro Clear were engaged by a major council to deliver a full clearance of one of their office buildings, previously occupied by around 100 staff.

The project required a sustainable, transparent solution that could provide a full audit trail for all items removed – something their existing maintenance contractors were unable to offer.

Despite being a time-sensitive requirement, we were able to provide a total clearance of heavy and bulk items without any disruption to staff.

The Challenge

– Clear a large multi-floor office space within 5 working days
– Provide full transparency and reporting for all assets and materials leaving the site
– Handle specialist removals, including two large safes that needed to be craned out
– Minimise disruption to ongoing building operations
– Ensure compliance with the council’s sustainability and recycling commitments

Our Approach

Enviro Clear’s proposal stood out from three incumbent providers because we prioritised:

– Sustainability: Every item was processed with reuse, resale, recycling or responsible disposal in mind.
– Transparency: A detailed audit trail and final project report documented the destination of all cleared assets.
– Specialist Capability: Heavy, awkward items such as the safes were carefully planned for and removed using crane operations.
– Efficiency: Works were completed safely and on schedule within 5 working days.

Results

– Full clearance completed on time and within budget
– Audit trail supplied to demonstrate the sustainable handling of all assets and materials
– Two large safes successfully lifted and removed by crane
– Client confidence achieved by demonstrating modern, transparent practices that exceeded traditional contractor methods

Testimonial

“Enviro Clear gave us full confidence throughout the process. Their reporting and sustainability measures went above and beyond what we’ve had before, and the project was completed smoothly from start to finish.”

Project Highlights

– 100-staff office cleared in 5 working days
– Detailed sustainability and audit reporting provided
– Heavy safe removals completed via crane
– Transparency and sustainability at the heart of delivery